Project Introduction
The Linzhou Thermal Power Unit Project is one of the key construction projects in Henan Provinces "Eleventh Five-Year Plan" for power development. The project responds to the national industrial policy of "replacing small units with large ones" and energy saving & emission reduction, adopting supercritical generator units with high parameters, large capacity, and high efficiency.

Solution
After the enclosed renovation of the coal yard and coal unloading trench of Datang Linzhou Thermal Power Co., Ltd., it is necessary to position personnel and coal unloading machinery in the trench to achieve "people walk on walkways, vehicles drive on roads."Functions include automatic audible and visual alarm when someone enters the moving fence around machinery, and background integrity alarm when staff contact coal truck drivers.After the system upgrade, it needs to interface with the Fuel Three Major Projects control platform to transmit analog position signals from the bucket wheel reclaimer and impeller coal feeder to the three major projects.
